Support Services Featured Project

Project Name: Westside Major Sewer Lift Station

Project Image
Additional
Project
Photos
  • Project Photo
  • Project Photo

Design and construction oversight of a sewage lift station sized for 4,000 gpm (5.8 MGD) vertical submersible pumps but initial capacity will be at 2,000 gpm. This station is Phase 2 of the Westside Boulevard Extension, and serves the expanding commercial area along Martin Luther King Boulevard and Westside Boulevard in Houma, LA. An 18-inch forcemain was connected to the station linking to the North Terrebonne Sewage Treatment Plant. Further work consisted of electrical controls design and hydraulic analysis for new pump sizing. Anticipation of public sanitary sewers being extended further north towards Thibodaux along the Bayou Terrebonne corridor is expected to result in an increase in sewage loading on the Oakshire holding basin. So, as part of the engineering services, a master layout was prepared to assist with long-term planning for future expansion.

Services Provided

Project Management and Representation
Topographic Surveying
Engineering Design (Civil, Electrical)
SCADA/Telemetry Design
Hydraulic Analysis
Plans and Specifications
Permitting
Utilities Coordination
Right-of-Way Acquisitions
Bidding Documentation and Assistance
Construction Administration
Quality Assurance / Quality Control

Location
  • Terrebonne Parish, LA
Completion Date
  • 2012
Client
  • Terrebonne Parish Consolidated Government