Engineering Featured Project

Project Name: West Grand Terre Beach Nourishment and Stabilization - Structure Demolition and Removal

Project Image
Additional
Project
Photos
  • Project Photo
  • Project Photo
  • Project Photo

Phase 1 of the West Grand Terre Beach Nourishment and Stabilization project is the structure demolition and removal of several buildings and structural features prior to construction of the beach and marsh components for this nourishment project. The structures to be demolished and removed include existing lab and dorm buildings, a boat shed and lift, a water cistern, three (3) water tanks, a radio tower and a shack and honeybee farm.  Due to the age of the buildings, regulated hazardous materials such as lead­ based paints (LBPs) and/or asbestos containing materials (ACM), may potentially be present. The West Grand Terre Demolition Project will not only require the removal of existing buildings and structures, but also the abatement of any hazardous materials within the buildings and structures. Providence assisted CPRA with the services listed on the right. 

Services Provided

Construction Administration
Pre-construction Conferences
Shop Drawings and Submittals
Construction Progress Meetings
Construction Inspection
Final Inspection
Project Completion Report
Protected Species Surveys
UAS (Drone) Services

Location
  • Jefferson Parish
Completion Date
  • Ongoing
Client
  • Coastal Protection and Restoration Authority (CPRA)