Providence

  • Our Company
  • Careers
  • Contact
Projects
  • Home
  • Services
  • Industries Served
  • Products
  • Education & Training
  • Downloads
  • PEER Institute

Featured Projects

  • AIM: Your World in Real Time
  • Hurricane Damage Inspections 37 Affected Parishes, Louisiana Property Evaluations and Inspection Team Training
  • Drainage Diversion Canal, West Baton Rouge Parish
  • Equipment Relocation, AEP - Dolet Hills Lignite Company, DeSoto Parish
  • Hurricane Isaac Debris Removal and Monitoring
  • Evaluation of Innovative Ozone Mitigation Strategies

Drainage Diversion Canal, West Baton Rouge Parish

Providence is assisting in the preparation of an application to the Louisiana Office of Community Development’s Disaster Recovery Unit (ODC-DRU) for funding under the Hurricanes Gustav and Ike Community Development Block Grant (CDBG) Recovery Program.  The project requires professional engineering services for construction of a 3,700 foot diversion canal connected to the Intracoastal Waterway to improve storm water drainage from northern sections of West Baton Rouge Parish.

The scope of work includes: preparation of boundary maps and legal descriptions of each parcel to be acquired if property/servitude/rights-of-way acquisition is required to facilitate the project; assistance assembling a construction bid package conforming to applicable CDBG-DRU requirements and consisting of the supervision of bid advertisements, tabulation and the award process; assistance conducting pre-construction conferences; field-staking, on-site construction oversight and preparation of inspection reports; review, approval and submission of all contractor requests for payment to the parish; provision of reproducible plan drawings upon project completion; permitting; final inspection/testing; and submission of certified as-built drawings to the appropriate state agency.

Copyright © 2010-2012 Providence Engineering and Environmental Group LLC, All Rights Reserved.
Terms and Conditions

Powered by Velocity Squared